Industrial

For ventilation of the working area, forced suction ventilation is provided. Calculations are based on 3-stroke air exchange. It is…
For ventilation of the service area, forced suction ventilation is provided. It is constructed with galvanized sheet metal ducts and…
The facility is conventionally divided into five main areas - Office, Personnel Premises, Auto Service, Preparatory and Warehouse for Auto…
The building is a one-storey building - a blasting and painting workshop. The following premises are distinguished: blast-furnace, painting, shed,…
The exhaust ventilation is made of non-insulated ducts made of galvanized sheet metal. In the horizontal section is designed with…
Main room - Packing The ventilation installation is calculated on a one-time air exchange. In order to provide the necessary…
In connection with the expansion of the investor's investment intentions the presentproject envisages the construction of a new food storage…
                   Building Rough Grills          Suction ventilation is provided…
The Heat Center consists of: Two 157kW condensing gas boilers providing Tinst 45/40 °C, 115kW air-to-water heat pump at 40%…
Each of the buildings in question is made of steel construction and thermal panels. The cover is also made of…
facebook_page_plugin