Oazis Beach Club Lozenec

This project looks at the underground floor of a hotel building. This project provides a solution for the ventilation and air conditioning of the premises under consideration. For this purpose are provided for the installation of exhaust ventilation systems with duct split systems for SPA Center, Fitness and BBA Fast Food. Ventilation installations for all premises from the SPA Center, Swimming Pool, BCA Fast Food, Sanitary Facilities and Kitchen with adjoining rooms. Due to the presence of appliances operating with LPG in the kitchen unit, emergency ventilation is provided with an explosion-proof fan. For climatization of the premises are envisaged split systems with indoor units type "ceiling cassette".

 

Link to website

 

facebook_page_plugin